Αποτελέσματα Αναζήτησης
Schlüter-DITRA-DRAIN is a safe and per-manently effective passive capillary drainage system for floor assemblies. The material is installed in exterior areas into thin bed adhe-sive over a sloped waterproofing assembly, such as Schlüter-KERDI or other suitable proprietary waterproofing systems.
The size of floor drains is important as it affects the number of drains required and the amount of water which can be efficiently drained. As a general reference, floor drains should be sized to handle an overflow condition of water that may be discharged onto the floor. The chart below illustrates water outlets and the demand (GPM) requirements.
Browse this section to find our price list, installation handbooks, technical data sheets, CAD drawings, product brochures, warranty information, and much more. Here in our library, you’ll find support material for everything we do at Schluter.
Items covered in the Water Management Drainage Handbook include specifications, structures, hydraulics, durability, installation, retention/detention systems, general technical notes, sanitary sewer systems, sanitary technical notes and a summary of standard specifications.
Fixed height floor drains are convenient and free-standing units which are suitable for concrete, resin or tiled floors. Adjustable floor drains can be installed either with a floor drain top or ACO Trench Drain (see page 54) in most flooring constructions, including floors with waterproofing membranes. Fixed height solution Adjustable solution ...
HOW TO SELECT A FLOOR DRAIN. Floor and area drains receive liquid from surrounding areas and by the attached piping, convey the liquid to the storm or sanitary drainage system. Floor drains are primarily used for inside locations where the flow rate into the drain can be anticipated.
SMITH®. FLOOR DRAINS TECHNICAL DATA. CUSTOMER DRIVEN. HOW TO SELECT A FLOOR DRAIN. Floor drains are primarily used for inside locations where the flow rate into the drain can be anticipated. Sufficient top size and grate free area to pass the anticipated flow are required.