Yahoo Αναζήτηση Διαδυκτίου

Αποτελέσματα Αναζήτησης

  1. Reko Diq is expected to have a life of at least 38 years as a truck-and-shovel open pit operation with processing facilities producing a high-quality copper-gold concentrate. Construction is expected in two phases with a combined process capacity of 90 million tonnes per annum. Learn More.

  2. The Reko Diq area is part of the Tethyan Magmatic Arc, extending through central and southeast Europe (Hungary, Romania, Bulgaria, Greece) Turkey, Iran and Pakistan through the Himalayan region into Myanmar, Malaysia, Indonesia and Papua New Guinea. It contains wealth of large copper-gold ore deposits of varying grades.

  3. www.smec.com › project › reko-diq-mineReko Diq Mine - SMEC

    Located in the Chaghi District of Balochistan in Pakistan, Reko Diq is a large copper and gold deposit containing 12.3 million tons of copper and 20.9 million ounces of gold in inferred and indicated resources.

  4. 18 Ιουλ 2022 · With its unique combination of large scale, low strip and good grade, Reko Diq will be a multi-generational mine with a life of at least 40 years. During peak construction the project is expected to employ 7,500 people and once in production it will create 4,000 long-term jobs.

  5. 1 Αυγ 2023 · Islamabad, Pakistan – Barrick Gold Corporation (NYSE:GOLD) (TSX:ABX) president and chief executive Mark Bristow says with the updated feasibility study on the giant Reko Diq copper-gold project making rapid progress, the company is aiming to start production in 2028.

  6. The current conceptual mine plan is based on 4 porphyry deposits within the Reko Diq project area (H13, H14, H15 and H4) Reko Diq is located in the Tethyan Belt, a highly prospective tectono -magmatic and metallogenic belt extending from Eastern

  7. 23 Αυγ 2024 · Reko Diq is one of the world’s biggest undeveloped copper / gold deposits. It will be a multigenerational mine with a life of at least 40 years. The contemplated mine plan is based on four...

  1. Γίνεται επίσης αναζήτηση για