Αποτελέσματα Αναζήτησης
The CMR Online is composed of Eleven (11) sections. Complete all the Ten (10) sections of the CMR online and you will be directed to Section 11 for the preview of your CMR Online.
CMR is a documentary requirement prepared by the Proponent to report performance/ compliance. Performance against the monitoring of actual impacts (including residual impacts) as against predicted impacts in the EIA Report and as related to current project operations.
The CMR Online System is currently applicable only for Environmentally Critical Projects (ECPs) ll. EXECUTIVE SUMMARY This section should include a summary of the major findings for the monitoring period.
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR): Semi-annual Module 5 of SMR (The status of compliance to the ECC conditionalities and the attainment of EMP commitments should be elaborated in this section.
l PROPONENT whose projects have been issued an ECC are primary responsible for monitoring their projects. v Self-Monitoring Report Monitoring Report (CMR) (SMR) & Compliance. Levels of Monitoring and Needed Reports. l MULTI-PARTITE MONITORING TEAM (MMT).
The detailed report on compliance to environmental standards specific to environmental laws shall be. submitted through the Self-Monitoring Report (SMR) as required on a quarterly basis to the concerned EMB RO.
Compliance Monitoring Report (CMR) – a semi-annual report submitted by the project proponent to EMB to report its self-monitoring of compliance with the requirements under the Philippine EIS System.