Αποτελέσματα Αναζήτησης
The Casco Bay Bridge is a bascule bridge that spans the Fore River, connecting South Portland and Portland, Maine, United States. The bridge carries four lanes (two in each direction) of State Route 77, a bike lane in each direction, and a pedestrian sidewalk on the east side of the span.
Casco Bay Bridge. Lat / Lon: N 43° 38.704' / W 070° 15.473' Bridge Type: Bascule; Vertical Clearance (Closed): 55.00 ft. Horizontal Clearance: 196.00 ft. Schedule: Opens on signal. Editor's Note: Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts.
28 Ιουν 2011 · A searchable record of ships passing Detroit based on AIS observations, updated in real time.
There is nothing lovely about this bridge. The tourist Mecca of Portland obviously made a budget conscious decision at the time instead of creating an architecturally noteworthy statement that might improve their coastal skyline. It is flat on concrete pylons. It gets you from A to B and that’s it.
19 Σεπ 2024 · 12 Day - Great Lakes & Georgian Bay Cruise. Departing From: Toronto, ON to Milwaukee, WI (Or Reverse) Ports of Call: Toronto, ON • Niagara Falls (Port Colborne), ON • Cleveland, OH • Detroit, MI • Midland, ON • Parry Sound, ON • Sault Sainte Marie, ON • Mackinac Island, MI • Muskegon / Holland, MI • Milwaukee, WI.
15 Οκτ 2024 · Peaks Island Schedule. Currently Displaying: Winter Schedule. Effective: October 15, 2024 – April 18, 2025. KEY: cf = Car Ferry (transports cars and passengers)
29 Φεβ 2024 · Projects on several state roads in South Portland, including Rt. 77/Casco Bay Bridge, will begin July 7, 2024. The state will make traffic control improvements on the bridge and mill and pave state roads.