Αποτελέσματα Αναζήτησης
The purpose of this document is to discuss the requirements for planning and performing an incidental lift using an overhead crane and commonly available rigging components, such as slings, shackles, eye bolts, and turnbuckles.
This rigging plan is for work on a self-support tri-face structure of unspecified height. The lifting system will use a top block only with a straight tag line. Additional documents are required to show lifting component details and attachment to the tower.
The rigging plan is designed to address the hazards associated to rigging and allows the user to create a visual representation of their plan. The plan is available
1 Φεβ 2021 · The purpose of this Crane and Rigging Manual is to provide Sundt Authorized Operators, Qualified Riggers, Assembly/Disassembly Directors, Qualified Crane Managers, Site Managers, Project Managers, and HSE personnel with the requisite policy, procedure, standard, and regulation information needed
Providing accurate details in a rigging plan helps operators position cranes correctly. 1) A rigging plan is essential for safely executing lifting jobs and should show key details like load dimensions, crane capacities, and obstacles.
The document provides guidance on developing a rigging plan that includes calculating the weight of the load, finding the center of gravity, selecting accessories, and developing a sequence of operations.
(e) ensuring that the area for the crane is adequately prepared. The preparation includes, but is not limited to, the following: (1) access roads for the crane and associated equipment (2) sufficient room to assemble and disassemble the crane (3) an operating area that is suitable for the crane with respect to levelness, surface conditions,