Αποτελέσματα Αναζήτησης
Average Joint Cure Times for PVC, ABS and CPVC Solvent Cements. Contact Oatey Technical Services for cure times for pipe larger than 8" diameter. This data is applicable only for new piping installations and not recommended for repair or cut-ins on hot and cold water distribution systems.
This article gives tables of hold, set & cure times that should be respected when cementing PVC or CPVC piping systems. Here are definitions of plastic pipe gluing "hold time" (how long to hold the joint when gluing), set time (how long before you can move the piping around) and cure time (how long before the piping can be exposed to pressure.
AVERAGE INITIAL SET TIMES FOR SLUYTER PVC/CPVC SOLVENT CEMENTS. In damp or humid weather allow 50% more set time; extended set times are required for chemical applications. Important – The initial set schedule is the necessary time needed before the joint can be carefully handled. 2. JOINT CURE SCHEDULE.
Average Joint Cure Times for PVC/CPVC Solvent Cements. Joint cure time is the time required before pressure testing the system. In damp or humid weather allow 50% additional cure time. line to determine joint cure time. ons and not recommended for repair or cut-ins on hot and cold water distribution systems. Pleas. contact Oatey Te.
See the chart below for approximate curing guidelines. Average Time Schedule of PVC/CPVC Solvent Cement Cure Temperature Range (during assembly and cure period)
Individual solvent cement manufacturer’s recommendations for the cement being used should be followed. The cure time is the recommended waiting period before pressurising newly assembled joints. Temperature Range
with cements and primers please follow ASTM F402 for safe handling of these products. Cure time will vary depending on temperature, product type, pipe size and fit. For set and cure times we recommend following the ASTM guides for solvent cement, such as those found in ASTM D2855. Longer cure times will result in stronger joints.